top of page
Search

9/20/2020 The build begins.

Been spending lots of time in the garage glass beading and prepping everything to put together the rolling chassis.


Finished the paint booth and setting up of a new scroll compressor and air dryer system. Spending more time getting the garage ready to do the work ahead of us than actually on the car.


Got sidetracked with son's Gti vr6 and buying and road readying a 2000 silverado to move the TVR pieces around.


Had Valerio Machine shop fabricate spare tire mount and bonnet pivots. Mike put a level on the frame and found it slightly twisted so off to Kop autobody to have that straightened before blasting and painting. Had the frame blasted clean and enamel coated with a nice high gloss black top coat.



Meanwhile all our suspension, axle and brake parts arrived.


We can start putting this thing back together!


Subscribe or check back with us from time to time to view our progress, comment, or offer any advise you may have on what to do and not to do during our project. Thanks for viewing and happy motoring, Jonathan A. and Jonathan F.




47 views0 comments

Recent Posts

See All
bottom of page